BTS Engineer/Field Manger/Construction
Manager, Nokia/T-Mobile
September 2014 – Present
·
Timely reporting to immediate supervisor
of daily operations
·
(MOP) Methods of Procedure
·
Nokia installation, commissioning and
integration
·
Integrating new system modules 2G/3G/4G
(LTE) onto networks
·
Cleaning/testing of fiber optic cables
·
Level 1/2/3 certified integrator
·
BTS site manager/ BTS software
· Managing several
crews
· Assigning job
tasks daily
· Certifying cell
sites are built to standard & on time
CONFIGURATION TECHNICIAN, SAMSUNG/SYNCREON
April 2014 – September 2014
· Timely reporting
to immediate supervisors of daily operations
· Building TEXON and
ELTEK Cabinets daily
· Installation of
Rectifiers
· Installation,
termination of routers
· Installation of
modules (CDMA, LTE)
· Installation of
CICA-A, CICA-D cards, Blank Panels, Dummies and FIBER OPTIC TRAYS
· Uploading of ENV
software
· Upgrading L9 cards
in LTE modules from 2.0 to 3.4
· Uploading correct
licenses in routers
· Upgrading CIMA in
CDMA from 2.0 to 3.0
· Upgrading UAMA in
LTE from 2.0 to 3.4
· Documentation of
every cabinet built (PASS or FAIL, PICTURES, SCAN SHEETS)
fIELD sERVICE eNGINEER, T
MoBile/Nokia
March
2012 – March 2014
· Timely reporting to
immediate supervisor of daily operations
· POTS and VOIP
technology
· (MOP) Methods of
Procedure
· Nokia Siemens
network installation, commissioning and integration
· Integrating new
system modules 2G/3G/4G(LTE) onto networks
· Data transfer of
WLAN and LAN
· Fiber optic
termination
· Cleaning/testing
of fiber optic cables
· Level 2 certified
integrator
· RETS
· BTS site manager/
BTS software
· 2G/3G shared
· Cable management
Field Technician, Blue NET
Solutions
May
2008 – March 2012
· Install, testing,
and troubleshooting using T-Berd 950 of T1
· Microwave/Fiber
backhaul install/support of T1
· UMTS/GSM
troubleshooting
· Prep/punch list of
civil installation
· Fiber optic
testing
· Hybrid fiber
installation
· Installation,
commissioning, and integration of Metrosite
· UMTS/ GSM
Integration
· Flexi
Certified-NSN-Level 2 Installation, Commissioning, and Integration of
LTE/UMTS/GSM
· UMTS/GSM New
Builds
· CCI Boosters
· Andrews Connectors
certified
· Spectrum analyzer
Interference Testing
· Tear Outs
Field Technician/ Supervisor,
Comcast
April
2006 – May 2008
· Comcast cable
network installation and maintenance
· Existing devices
integration such as cell phones, computers etc….
|